Wind power plants

  • Ai-Petri wind power plant, Ukraine: installed capacity 0,81 MW andelectric output 900 MW/year; Schematic and detailed design, 1991, (Commissioned in 1992)

  • Adzhygolsk wind power plant, Ukraine: installed capacity 1,2 MW andelectric output 1340 MW/year; Schematic and detailed design, 1992, (Commissioned in 1992)
  • Novoushytsk wind power plant, Ukraine: installed capacity 0,22 MW andelectric output 250 MW/year; Detailed design, 1994
  • Zborovsk wind power plant, Ukraine:, installed capacity 0,22 MW andelectric output 250 MW/year; Detailed design, 1994
  • “SolnechnayaDolina” wind power plant, (modernization), Ukraine: installed capacity 0,2 MW andelectric output 233 MW/year; Feasibility study, 1995
  • Adzhygolsk wind power plant (updating), Ukraine: installed capacity 1,245 MW andelectric output 1415,3 MW/year; Schematic and detailed design,1999
  • Aulska wind power plant, Ukraine: installed capacity 0,2 MW andelectric output 233 MW/year; Schematic and detailed design, 1999
  • Donuzlava Wind Power Plant, Sudak section, stage 5, Ukraine: installed capacity 5,0 MW andelectric output 8852 MW/year; Schematic and detailed design,2001, (Commissioned in 2002)
  • Donuzlava Wind Power Plant, Sudak section, stage 6, Ukraine: installed capacity 6,3 MW andelectric output 13654 MW/year; Schematic and detailed design,2002 (Commissioned in 2003)
  • Extension of Sudak section of Donuzlavawind power plant, Ukraine: installed capacity 50,0 MW andelectric output 90345 MW/year; Feasibility study, 2002
  • Vyshgorod wind power plant, Ukraine: installed capacity 5,0 MW andelectric output 8296 MW/year; Feasibility study, 2003
  • Vyshgorod wind power plant, Ukraine: installed capacity 0,625 MW andelectric output 1037 MW/year; Schematic and detailed design, 2006