87.3 MW Verkhne-Krasnogorsk HPP on the River Kuban was designed in the late 1980s, and several times updated.
HYDROTECHPROJECT Ltd. accomplished the following works for Verkhne-Krasnogorsk HPP:
- Development of detailed design on the 1st stage of the construction of the headworks (water intake, spillway, earth dams), 2010