441 MW Ust-Khantayka HPP on the Khantayka River is located in the Krasnoyarsk region, near the Snezhnogorsk town and was designed to supply MMC Norilsk Nickel. Ust-Khantayka HPP has been in operation since 1975 and is under rehabilitation at present.
HYDROTECHPROJECT Ltd. accomplished the following works concerning the reconstruction of Ust-Khantayka HPP:
- Technical requirements for the design of Ust-Khantayka HPP rehabilitation. Detailed design, 2012
- Development of detailed design on the replacement of hydro units equipment, 2012-2021