Hydropower facilities / Hydropower plants (HPP)

Ust-Khantayka HPP

441 MW Ust-Khantayka HPP  on the Khantayka River is located in the Krasnoyarsk region, near the Snezhnogorsk town and was designed to supply MMC Norilsk Nickel. Ust-Khantayka HPP has been in operation since 1975 and is under rehabilitation at present.

HYDROTECHPROJECT Ltd. accomplished the following works concerning the reconstruction of Ust-Khantayka HPP:

  • Technical requirements for the design of Ust-Khantayka HPP rehabilitation. Detailed design, 2012
  • Development of detailed design on the replacement of hydro units equipment, 2012-2021