Tail Storages

  • Slime settling reservoir, Ordzhonikidze Mine, Ukraine: capacity 13,5mln. m3, max. height 9 m andlength4,5 km; All stages of design, commissioned in 1974
  • Slime settling reservoir, Voroshylov Mine, Ukraine: capacity 10mln. m3, max. height 6,6-7,3 m andlength 3,45 km; All stages of design, commissioned in 1975
  • Slime settling reservoir, Dnieproenergostroiprom enterprise, Ukraine: capacity 25mln. m3, max. height 4-11 m andlength 2,2 km; All stages of design, commissioned in 1976
  • Konstantinovka Sludge Collector, Ukraine: capacity 0,4mln. m3, max. height 22 m andlength 1,2 km; All stages of design,1962, commissioned in 1965
  • Tail storage of YSouth Ore and Mining Complex, Ukraine: capacity 510mln. m3, max. height 100 m andlength 4 km; All stages of design, 1992-1994
  • Rehabilitation of “Obyedinennoe” tail storage, South Ore and Mining Complex, Ukraine: capacity 98,5mln. m3, max. height 28 m andlength 6,1 km; Schematic design, 2005-2006
  • Pile-up of ash disposal area of Pridneprovska TPP, Ukraine: max. height 35 m andlength 0,6 km; Detailed design, 2010
  • “Berezoviy Log” Sludge Collector, Russia: capacity 220mln. m3, max. height 75 m andlength 5,5 km; All stages of design, commissioned in 1975
  • Tail storage of Lebedinskiy Ore and Mining Complex. Protection of “Yamskaya step” conservation area, Russia: capacity 1027,5mln. m3, max. height 51 m andlength 3,04 km; Schematic and detailed design, 1986
  • Rehabilitation of Tail Storage, Lebedin Mine, Russia: capacity 590,3mln. m3, max. height 90 m andlength 23,3 km; All stages of design, 1988-1992, 1999, 2002
  • Elaboration of technical regulations for extension of pumping plant for the 2nd stage of Stoilenskiy Ore and Mining Complex, Russia; Schematic and detailed design, 2006, (1st stage commissioned in 2008)
  • Elaboration of technical regulations for water circulation structure of Stoilenskiy Ore and Mining Complex, Russia: length 0,8 km; Schematic and detailed design,2006, commissioned in 2008
  • Technical regulation ofpulp thickening unit of water recycling and transportation of tails of tail storage at Stoilenskiy Ore and Mining Complex, Russia; Detailed design, 2006
  • Visual reconnaissance inspections of actually fulfilled works on the rehabilitation of pumping plant of water recycling No.2 of Stoilenskiy Ore and Mining Complex, Russia; 2011