Hydropower facilities / Small hydropower plants (SHPP)

Parande HPP

Construction of derivative Parande HPP (4 MW) in Panjshir province, was started in 2007 -2008 under the schematic design by Russian company "Norman". In 2008 the constructional works were stopped. And in early 2013, the construction of HPP were resumed. Regarding this, HYDROTECHPROJECT Ltd. accomplished the following design works for Parande HPP:

  • Refinement of the design solutions, 2013