53 MW Mtkvari HPP on the Mtkvari (Kura) River of derivative type is located in Aspindza and Akhaltsikhe districts of Samtskhe-Javakheti region in Southern Georgia. Mtkvari HPP uses a maximum Mtkvari River water drop of 105.2 m through the pressure tunnel of 9.6 km length which connects the headwork with powerhouse
Designing of the HPP was started in 2009 and at present Mtkvari HPP is under construction.
Works accomplished by HYDROTECHPROJECT Ltd.:
- Design works on the justification of structures (pressure tunnel, operational spillway), instrumentation. Detailed design, 2011-2012
- Detailed design and engineering supervision over the completion of Mtkvari HPP construction. Erection bay and auxiliary equipment, 2014-2016