625 MW Kremenchuk HPP is the third stage of the cascade on the Dnieper River and has been in operation since 1960. Facilities of the hydro scheme form the largest water reservoir in Ukraine with useful capacity of about 9 billion. m3 and protective structures.

From 1997 till 2002 the first stage of rehabilitation of the Dnieper Cascade of HPPs was completed; and in 2006 the second stage of rehabilitation started. The rehabilitation also included the rehabilitation of Kremenchuk HPP equipment.

Within 2nd stage of Rehabilitation HYDROTECHPROJECT Ltd. accomplished the following works:

  • Analysis of the design documentation over hydrounits Nos. 8 and 9 rehabilitation , 2015
  • Complex inspections of the current state of hydrotechnical structures of HPPs and PSPs operated by Ukrhydroenergo PJSC to rise the reliability and safety of their operation at design conditions taking into account contemporary requirements on reliability and safety of hydro schemes operation. Detailed design, 2015-2017