High-voltage power transmission lines

  • Dnieper – Donbass Canal, 8 pumping plants – 10, 35, 110kV HV transmission lines, Ukraine, 450,0 km length; Commissioned in 1980-1995
  • Dniester HPP and Dniester PSP, Buffer HPP – 35, 110, 330kV HV transmission lines, Ukraine, 120,0 km length; Commissioned in 1993-1998
  • Snyatinska HPP – 10kV HV transmission line, Ukraine, 4 х 6 km length; Commissioned in 1995
  • Kremenchuk HPP – overhaul of 330kV HV transmission line "HPP – Pervomaisk”, Ukraine, 12 km length; Commissioned in 1998
  • South Ukrainian power complex, Ukraine:
    • Alexandrovska HPP – 10kV HV transmission line, 20 km length; Commissioned in 1999
    • Alexandrovska HPP – 35kV HV transmission line, 5 km length; Commissioned in 2001
    • Tashlyk PSP, 6kV cable lines, 15 km length; Commissioned in 2001
    • Tashlyk PSP, reconstruction of 330kV HV transmission lines No. 1 and No. 2, 14 km length; Commissioned in 2003
  • 330kV HV overpass “Novoodeska – Artsyz” over the Dniester estuary, Ukraine, 5,9 km length; Feasibility study, Commissioned in 2007