Dnieper HPP (DneproGES) includes two hydropower plants: Dnieper HPP-1 (585 MW) and Dnieper HPP-2 (876,6 MW).

Dnieper HPP-1 is the oldest hydropower plant of the cascade on the Dnieper River (commissioned in 1932 and in operation at present since post-war reconstruction in 1951).

The second stage (Dnieper HPP-2) was commissioned in 1978.

From 1997 till 2002 the first stage of rehabilitation of the Dnieper Cascade of HPPs was completed; and in 2006 the second stage of rehabilitation started. The rehabilitation also included the rehabilitation of Dnieper HPP equipment.

Within 2nd stage of Rehabilitation HYDROTECHPROJECT Ltd. accomplished the following works:

  • Automated control system of hydraulic structures. Addition to the layout diagram of point tensometers of spillway dam, 2012
  • Analysis of the design documentation over hydrounit No. 17 rehabilitation. Detailed design, 2015