HYDROTECHPROJECT – design and engineering solutions in the field of hydropower
GENERAL INFORMATION:
Hydrotechproject Ltd., established in 2007 as a part of Design Engineering Complex “GRANT” that also includes Ukrhydroproject PJSC, Interdepartmental Centre of Engineering Researches Ltd. and Ukratomenergoproject Ltd., specializes in providing design and engineering services for hydropower construction and water management, as well as in developing renewable energy sources in Ukraine and abroad.
Hydrotechproject Ltd.’s strategy is to work in the state-of-the-art information environment and to widely use innovative technologies during the design of complex power generating facilities. This implies, in particular, the integration of multiple complex computer-aided design (CAD) systems what is one of the critical conditions for the effective management of the entire life-cycle of the facility.
Читать далее
ACTIVITIES:
Hydrotechproject Ltd. carries out design works related to the construction of hydropower plants, pumped storage plants, thermal and nuclear power plants, canals, hydrotechnical structures at ore and mining complexes, transmission lines, substations, residential and public buildings, as well as landscaping. Software acquired by the company allows it to perform all necessary design and engineering calculations.
The company carries out the following types of work:
- Design works
- Engineering works
ENGINEERING AND TECHNICAL SUPPORT
During the design process HYDROTECHPROJECT LTD. uses various software, such as AutoCAD, Inventor, Mathcad, Lira, MIDAS, ANSYS and others. In perspective the company foresees a possibility for its staff to work in parallel with high-level IT products on various technological platforms, depending on customer’s requirements.
At this stage, company performs scientific and technical support for hydraulic and power structures at all stages of design, performs the calculations related to the slopes stability, stressstrain state and seepage strength of the dams, as well as mathematical modeling and calculation substantiation of various hydraulic structures. Read more
NEWS

Obtained Patent of Ukraine No. 110425 The precast waterproof reinforced concrete lining made of the “asymmetrical eight” blocks for a pressure tunnel and the method of its installation.

Obtained Patent of the Russian Federation No. 2568016 for Invention A Self-Propelled Wind & Wave Hydropower Plant.
MANAGEMENT

Director General

Financial Director, Chief Accountant

Deputy Technical Director on Work Management

Deputy Technical Director on Equipment